Engineering

Contractors' all risks, erection all risks and machinery breakdown claims, with engineers who verify cause and repair cost.

Engineering and construction claims depend on technical evidence: why a machine failed, whether the damage happened during erection or operation, and what the manufacturer's repair actually requires. Our engineers investigate cause and verify repair costs, working with original equipment manufacturers and engineering consultants on complex losses.

Many of these risks are shared between several insurers, so we coordinate the adjustment across the panel and keep project delays to a minimum.

Specialist Areas

We offer specialist adjusting support in the following areas, including but not limited to:

  • Contractors' all risks
  • Erection all risks
  • Machinery breakdown
  • Plant and heavy equipment
  • Business interruption following machinery loss

Our Results in Engineering

Machine Damaged During Installation

A newly imported corrugated cardboard machine was damaged during installation at a Nigerian factory when a forklift struck a factory wall. The loss sat under an Erection All Risks policy shared by several insurers.

With engineering consultants we verified the damage and the manufacturer's repair requirements, identified the root cause and applied the policy warranties, resolving the claim across all insurers with minimal project delay.

Fire Damage to Mining Equipment

A fire damaged critical mining equipment at a major industrial company. Late reporting and later vandalism of the damaged machine made the evidence harder to preserve.

We carried out a technical analysis with the manufacturer's experts to verify the cause, applied penalties for policy breaches, removed duplicated invoices and applied the self-insured retention and deductibles, reaching a fair settlement across several insurers.

Breakdown of an Industrial Ice Cream Machine

A mechanical failure in the dasher assembly of a high-capacity ice cream machine contaminated the product and stopped production.

Maintenance records and the replaced parts were not available, so we relied on a detailed site assessment, interviews and document reviews to establish the extent of the loss, and recommended risk improvements to prevent a repeat.

Our Company Profile
Corporate Profile 2026